HBP - Emran in class  RAG 132

 VIRTUAL CONSTRUCTION



Assignment : Update    |     Class on 27 Oct 2010                                                                              


Lecturer : 1B
Conclusion: Holistic Production

Lecturer conclude all chapter is about Built Enviroment & human settlement which we can see it in
different perspective & scale . All the subject given is related one to another subject
with all input as one.




We would like to thanks to All lecturer with their heart & mind
used to teach us in every aspect of life.


Salam.

Assignment : Update    |     Class on 6 Oct 2010 & 13 Oct 2010                                                         


Lecturer : Dr Kausar
Sociological & Economic Aspects of Human Settlement 1


Lecturer : Dr Kausar
Sociological & Economic Aspects of Human Settlement 2

Lecturer highlight about the human & urban settlement, approach,
community & society & factor contribute to the urbanization.




Assignment : Update    |     Class on 29 Sept 2010                                                                           


Lecturer : Dr Kausar

Housing and Settlement

Intro

Human settlements means the totality of the human community - whether city, town or village - with all the social, material, organizational, spiritual and cultural elements that sustain it. The fabric of human settlements consists of physical elements and services to which these elements provide the material support.


Assignment : Update    |     Class on 22 Sept 2010                                                                           


Lecturer : Pn Wan Mariah

Quiz: Reinforcing Basic Understanding

10 questions need to give on the day.


status : submitted !


Assignment : Update    |     Class on 1 Sept 2010                                                                           


Lecturer : Pn Wan Mariah

Rules: Building By-Laws, Development and Producing the Built Enviro.

Basically in this class , lecturer is highlighting the planning process,rules & law,
 who involve in the actor part, a bit of infrastructure & design sequence.




 





Assignment : Update    |     Class on 25 August 2010                                                                           


Lecturer : Pn Wan Mariah

Aktor: Penghasil Alam Bina - Para Profesional, Kerajaan Tempatan, Badan Bukan Kerajaan, Awam.








Assignment : Update    |     Class on 18 August 2010                                                                            


Lecturer : Pn Wan Mariah

Act: Design, Working Dwgs, Submission, Planning and Building Approval, Construction, Completion.

Contemporary construction delivery system – in traditional system (design & built) being explained by Pn. Wan Mariah









Assignment Tugasan Berkumpulan                                                                                               


Tugasan rakit telah selesai dan tugas membersihkan kawasan "parking" rakit telah di settlekan. Atas arahan our VC.







---------------------------------------------------------------------------------



Assalamualaikum, 
Salam 1 Malaysia dan Selamat Hari Raya 

pada semua pengunjung laman web kami .
dibawah adalah update kami dalam membuat rakit dome menggunakan buluh dan sedikit penggunaan tiub getah untuk menyokong rakit serta pelampung.




Buluh dipotong mengikut spesifikasi yg telah di ukur.


Penerangan dari ketua kumpulan dalam melicinkan kerja2 
pembinaan rakit ini. Kerja kerja pemasangan dan pertukangan telah 
dilakukan dibawah satu bumbung iaitu di lokasi bawah jejantas motosikal RST.


Joining menggunakan tiub getah yg dipotong selebar 1". 
Setiap buluh mempunyai marking dan kepanjangan yg 
berbeza mengikut group order yg telah di rancang lebih awal lagi.



Kerja implementasi dapat dilakukan tanpa banyak masalah serta teratur.


Rupabentuk asas base rakit yg hampir siap.





Assignment : Tugasan Berkumpulan                                                                           



Tugasan yang kali ini kami diberi dalam kumpulan untuk membina sebuah dome(kubah) yang boleh memuatkan ahli kumpulan kami  seramai 3 orang dan diapungkan di atas air. Masa yang diberikan adalah selama 7 minggu untuk menyiapkan dome (kubah) ini.

 

 

Senarai ahli kumpulan  :-

 

AWG ISMAILLUDIN BIN AWG HUSAINI (KETUA)         109654

EMRAN BIN ISMAIL                                                             109655

MUHD SHAHRIL NIZAM BIN ISMAIL                               107305


Nama kumpulan : CORONA

 
A corona is a type of plasma "atmosphere" of the Sun or other celestial body, extending millions of kilometers into space, most easily seen during a total solar eclipse, but also observable in acoronagraph. Jadual perancangan aktiviti :- Jadual ini merangkumi aktiviti yang telah dirancang untuk dilaksanakan sepanjang tempoh yang telah diberikan Sesi Perbincangan ahli kumpulan Gambaran konsep binaan rakit dan dome yang bakal dibina :-

 


Assignment  2 Geodesic  Dome                                                                    

Assignment 2

Binaan Real | Real Construction

Iktisar | Brief

Blog your own production of a geodesic dome using bamboo sticks.


Minggu ini kami perlu menyiapkan sebuah structure yg memakan masa yg dikenali sebagai DOME.  Seperti biasa, kami para student mempunyai big "?" bila assignment diumumkan.  Seakan mengetahui pelajar x geti, 1B telah mengusulkan keywordnye - Dome calculator untuk memudahkan pelajarnye menyetelkan menyelesaikan assignment ini.


Antara bahan yg wajib dan alternative adalah seperti berikut :   

> Bamboo stick a.k.a lidi sate 
> Pisau & player cutter
> Klip penyambungan wayar berjumlah 130 pcs
> Aerosol spray (silver)
> Player long nose 2 nos
> Nut & bolt & test pen
> Pembaris & batt. powered screw driver cap black & decker


Ukuran diameter dome = 128cm dan menggunakan teknik 2V.

Panjang bagi batang A = 79.10 mm berjumlah 35 pcs

Panjang bagi batang B = 69.95mm berjumlah 30 pcs



Nut & bolts serta bamboo sticks yg telah siap di potong.


Klip penyambungan wayar yg telah dibeli dari electrical hardware. The closes to construction method yg boleh didapati.



Permulaan untuk mengikat dome ini saya telah mencuba untuk mencantumkan semua dahulu klip   

(4 joint dan 5 joint) seperti dibawah ini. Tetapi t

erdapat sedikit masalah disini dimana bamboo stick tidak dapat dilekatkan dengan sempurna kerana RULE nya itu harus bermula pada bamboo stick (joint klip pada bamboo dahulu!). Jadi terpaksalah membukanya kembali dan blue plastic (refer purple arrow) harus dibuang untuk installation yg sempurna.


Antara tools yg enter the frame dan klip dengan blue plastic yg telah dibuang. Luaskan bukaan grip klip tersebut untuk bamboo stick installation 

(refer purple arrow)

.

Buang blue plastic & luaskan bukaan for 130 pcs klip . .  it's take like forever!


Selepas habis kerjakan klip tadi, spraykan silver color pada bamboo stick, biarkan 20 min dan kumpulkan semua barang ke satu tempat.(dah nak start buat dome nie..)


Opp , sebelum pasang dome - kena la install klip tadi ke bamboo stick yg telah di silverkan n dikeringkan itu. (silver spray really turn out bamboo stick into metal look!!)


Thanks Arrow silver paint! Guys, belilah barangan buatan malaysia . . : )


Part join semua bamboo stick, saya mulakan dengan bahagian bawah dahulu kerana lebih mudah dan mengikuti alam semulajadi seperti pokok. (apa2 construction kebanyakannye mmg bermula dari bawah ie ground . . . .  so u must believe huhu)


Ok , perasan ada sesetengah klip mcm stargate punya weapon ek . .  itu disebabkan olih kedai electrical yg kehabisan stok . .  terpaksa buy version lain but still oleh guna . . . 


Teruskan joint sehingga ke layer kedua dome - peringkat ini jangan lagi joint menjadi dome, pastikan masih flat on ground dan teliti batang A & B supaya tidak konfius. 


Untuk memasang layer dome ketiga, barulah dome ini dicantumkan.


Ikat semua bamboo stick dan ketatkan semua joint bolt & nuts.  


Dan HASILnya :




Detail construction method pada joining (bahagian bawah)



Terdapat banyak reference kegunaan dome dari feature art, permainan di taman2 sehinggalah ke rumah kediaman. Antara contoh kebaikan DOME yg telah saya search di internet adalah seperti berikut:


Juga sebagai: 

The world's highest earthquake resistant

The Dome House is not only stable in structure but also extremely light in weight. It is because of this lightweight that the Dome House can withstand earthquakes.



Ultra-low cost

The Dome House is simple, since it is a prefabricated building with a small number of parts. Each Dome Piece is light and easy to carry, making the assembly quite easy. Because the construction of the Dome House requires only minimal manpower and a very short period of time, it is possible to reduce the substantial amount of labor costs.



Reference dari : 

http://www.i-domehouse.com/characters.html




Assignment  1 Binaan Virtual                                                                        

Using Images of the built-enviroment you were 

from before you joint USM, begin writing a pictorial blog 

expanding all

6 element of Production

submission date : 3 august 2010 @ 12.00 noon


NIAT (ATTENTION )

Niat dalam projek ini adalah untuk membina satu bilik mesyuarat seperti mana 3D perspektif yg telah dipersetujui dan juga dapat menaikkan imej syarikat ini serta mendapat keselesaan yg optimum.




LAKU (ACT)

Untuk menjayakan niat tersebut, laku atau “act” perlu ada dan ianya adalah salah satu element penting diperlukan bagi mencapai apa yg diinginkan. Element laku disini adalah membersihkan dan membuang segala yg tidak diperlukan .





PERATURAN (RULE)

Peraturan juga merupakan element terpenting dimana semua aktor terbabit hendaklah mengikut jadual kerja atau “scope of work” yg telah ditetapkan. Antara jadual kerja secara ringkasnya seperti berikut - mengikut susunan dari mula kerja:

 

  1. Site debris clearing           -  Selected contractor
  2. A/c ducting work                -  A/c contractor
  3. Sprinkler piping work         -  Selected contractor (bomba approval)
  4. Electrical work                    -  Electrical contractor
  5. Ceiling                                 - Plaster ceiling contractor
  6. Carpentry                             -  Selected carpentry contractor
  7. Carpet & Painting work




AKTOR (ACTOR)
Aktor merupakan elemen yang terpenting sekali kerana ia merupakan watak penting dalam menterjemahkan niat kepada hasil . Terdapat banyak aktor dalam pembikinan bilik mesyuarat ini antaranya adalah:

         -   Client

 -  Clearing site by selected contractor

 -  A/c contractor

        -  Selected sprinkler contractor (bomba approval)

        -  Electrical contractor

  - Plaster ceiling contractor

  -  Selected carpentry contractor

  - Carpet & Painting contractor





TEMPAT (PLACE)

Tempat dimana bilik mesyuarat diubahsuai terletak di Buttterworth, Penang.




HASIL (PRODUCT)

Dengan selesainya perlakuan yg telah dilakukan dengan niat tadi maka terjadilah hasil seperti yg diingini. Terdapat beberapa masalah juga sedikit kelewatan dari yg dijadualkan tetapi hasil tersebut adalah jelmaan niat sehingga 99%.






Submission : completed!


 

This free website was made using Yola.

No HTML skills required. Build your website in minutes.

Go to www.yola.com and sign up today!

Make a free website with Yola